Industrial Services · Toronto & the GTA

Electrical Engineering Services

Amps Logics Electric delivers engineering studies and system design for industrial electrical installations: coordination studies, arc flash studies, ground grid studies, system design and approval, and witness testing. The goal is a system that is safe, code-compliant, and built to perform.

ESA Licence #7011893 10+ Years Experience Industrial & Commercial Serving the GTA

Coordination Studies

Protective device coordination so faults clear at the right point and the rest of your system stays energized.

Arc Flash Studies

Incident-energy analysis and labeling to keep workers safe and your facility compliant with safety requirements.

Ground Grid Studies

Evaluation of grounding systems to protect personnel and equipment and confirm safe step-and-touch voltages.

System Design & Approval

New and upgraded electrical system design taken through the required approvals before work begins.

Witness Testing

Independent verification that installed equipment performs to specification before it goes into service.

Engineering that protects people and uptime

Industrial electrical systems carry enough energy that a small design oversight can become a safety incident or a costly outage. Proper engineering studies remove that guesswork. A coordination study makes sure the right breaker trips first. An arc flash study tells your team exactly what protective equipment a given panel requires. A ground grid study confirms that fault current has a safe path to ground.

We provide these studies for industrial and commercial facilities across Toronto, Etobicoke, King City, and the wider GTA, whether you are building new, expanding, or bringing an older installation up to current standards.

Frequently asked questions

What is an arc flash study and do I need one?

An arc flash study calculates the incident energy at each point in your electrical system and determines the protective equipment workers need. Ontario workplaces with energized equipment are generally expected to assess arc flash hazards, so most industrial facilities need one.

What is a coordination study?

A coordination study sets your protective devices so that during a fault only the nearest breaker trips, isolating the problem while the rest of the facility keeps running. It limits downtime and prevents unnecessary outages.

Why is a ground grid study important?

It verifies that your grounding system safely carries fault current and keeps step-and-touch voltages within safe limits, protecting both personnel and equipment.

Do you provide engineering services across the GTA?

Yes. Amps Logics Electric serves industrial and commercial clients throughout Toronto, Etobicoke, King City, and the surrounding Greater Toronto Area.